Project overview
Superb Electric LLC, an industrial electrical contractor based in Texas, was brought in midway through construction of SEG Solar's Factory 1, a 2 GW solar module manufacturing facility of approximately 350,000 square feet. Superb Electric took over the electrical scope after the customer determined the original contractor's work was not meeting the project's requirements, stepping in to complete a project that had already been underway for nearly a year.
Under a $4 million electrical contract, Superb Electric completed more than half of the total electrical scope — including design coordination, equipment integration, and full installation — in three months. The work included three 3,000 kVA transformers, four 4,000-amp main distribution panels, sixteen subpanel locations, and power distribution to 187 pieces of production equipment. The team applied the same engineering-based design and load planning approach used on SEG Solar's Factory 2, working through the integration of internationally sourced manufacturing equipment into a U.S. code-compliant electrical system. At peak, Superb Electric fielded 19 licensed electricians on site.
Being selected to take over and complete a stalled industrial electrical scope — and finishing the remaining work in a fraction of the time it had taken previously — reflects Superb Electric's ability to solve complex, high-stakes electrical problems under real time pressure, not only execute clean, new-build projects. The customer's satisfaction with this work led SEG Solar to designate Superb Electric as the electrical contractor for the second phase of its Texas expansion — the 4 GW Factory 2 project.
Project at a glance: ~350,000 sq ft, 2 GW solar module manufacturing facility · $4M electrical contract · project taken over mid-construction, completed in 3 months · 3 × 3,000 kVA transformers · 4 × 4,000A main distribution panels · 16 subpanels · 187 pieces of production equipment powered · 19 licensed electricians at peak · led directly to selection for SEG Solar Factory 2
Under a $4 million electrical contract, Superb Electric completed more than half of the total electrical scope — including design coordination, equipment integration, and full installation — in three months. The work included three 3,000 kVA transformers, four 4,000-amp main distribution panels, sixteen subpanel locations, and power distribution to 187 pieces of production equipment. The team applied the same engineering-based design and load planning approach used on SEG Solar's Factory 2, working through the integration of internationally sourced manufacturing equipment into a U.S. code-compliant electrical system. At peak, Superb Electric fielded 19 licensed electricians on site.
Being selected to take over and complete a stalled industrial electrical scope — and finishing the remaining work in a fraction of the time it had taken previously — reflects Superb Electric's ability to solve complex, high-stakes electrical problems under real time pressure, not only execute clean, new-build projects. The customer's satisfaction with this work led SEG Solar to designate Superb Electric as the electrical contractor for the second phase of its Texas expansion — the 4 GW Factory 2 project.
Project at a glance: ~350,000 sq ft, 2 GW solar module manufacturing facility · $4M electrical contract · project taken over mid-construction, completed in 3 months · 3 × 3,000 kVA transformers · 4 × 4,000A main distribution panels · 16 subpanels · 187 pieces of production equipment powered · 19 licensed electricians at peak · led directly to selection for SEG Solar Factory 2